BWM solver, BWM results and model of the operational cost price of hydrogen

DOI:10.4121/18589535.v1
The DOI displayed above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future. For a link that will always point to the latest version, please use
DOI: 10.4121/18589535
Datacite citation style:
Visserman, Douke (2022): BWM solver, BWM results and model of the operational cost price of hydrogen. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/18589535.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite

Dataset

The dataset includes the best-worst method (BWM) solver results found during expert interviews. In addition, the BWM results file includes the calculations to derive the average weights for the relevant factors and categories for the study as well as the relevance and technology scores for the competing hydrogen production technologies. The dataset also includes the model of the operational cost price of hydrogen as described in the research study.

History

  • 2022-01-19 first online, published, posted

Publisher

4TU.ResearchData

Format

xlsx

Organizations

TU Delft Faculty of Technology, Policy and Management

DATA

Files (15)