Survey data underlying the publication: Machine Learning for Construction Delay Prediction: A Model Built on Statistically Validated Key Factors
DOI:10.4121/a8964db2-cd13-4d59-bb53-876bce03078c.v1
The DOI displayed above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future.
For a link that will always point to the latest version, please use
DOI: 10.4121/a8964db2-cd13-4d59-bb53-876bce03078c
DOI: 10.4121/a8964db2-cd13-4d59-bb53-876bce03078c
Datacite citation style
Kryukov, Konstantin (2025): Survey data underlying the publication: Machine Learning for Construction Delay Prediction: A Model Built on Statistically Validated Key Factors. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/a8964db2-cd13-4d59-bb53-876bce03078c.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
The purpose of the study was to determine the causes of construction delays in Russia. The data was obtained by interviewing specialists on a 5-point scale on 32 previously identified factors.
History
- 2025-05-20 first online, published, posted
Publisher
4TU.ResearchDataFormat
*.csvOrganizations
Don State Technical University, Department of Construction Management, Rostov-on-DonDATA
Files (2)
- 2,259 bytesMD5:
76edad1cc2f3bdf0bc625b4e691cd850
README.txt - 12,866 bytesMD5:
ce6acff386f893e81e1855241a959695
Project1.xlsx -
download all files (zip)
15,125 bytes unzipped