Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly

doi:10.4121/17878508.v1
The doi above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future. For a link that will always point to the latest version, please use
doi: 10.4121/17878508
Datacite citation style:
Liming Zhao (2022): Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/17878508.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
usage stats
1285
views
374
downloads
categories
licence
cc-0.png logo CC0
According to the numbers of product and processing factory, 35 sets of data are formed, which conform to the distributed assembly flexible job shop scheduling problem with flexible assembly. Among them, the number of processing factory ranges from 2 to 8, and the number of product ranges from 2 to 6, 6 to 10, 10 to 14, 14 to 18, 18 to 22, 22 to 26 and 26 to 30. In addition, the data in each sheet represents a scale. The basic unit of measurement for all data is "1".
history
  • 2022-01-06 first online, published, posted
publisher
4TU.ResearchData
format
MS Excel, .xlsx
organizations
Chongqing University

DATA

files (2)