Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly
doi:10.4121/17878508.v1
The doi above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future.
For a link that will always point to the latest version, please use
doi: 10.4121/17878508
doi: 10.4121/17878508
Datacite citation style:
Liming Zhao (2022): Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/17878508.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
According to the numbers of product and processing factory, 35 sets of data are formed, which conform to the distributed assembly flexible job shop scheduling problem with flexible assembly. Among them, the number of processing factory ranges from 2 to 8, and the number of product ranges from 2 to 6, 6 to 10, 10 to 14, 14 to 18, 18 to 22, 22 to 26 and 26 to 30. In addition, the data in each sheet represents a scale. The basic unit of measurement for all data is "1".
history
- 2022-01-06 first online, published, posted
publisher
4TU.ResearchData
format
MS Excel, .xlsx
organizations
Chongqing University
DATA
files (2)
- 1,423 bytesMD5:
1de330a06254aef669be3d9323c37d28
README.txt - 341,083 bytesMD5:
3080f51c9f5993c76bb54e3402b279a7
Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly.xlsx -
download all files (zip)
342,506 bytes unzipped