Instances and file format for the Resource Constrained Project Scheduling Problem with Modular Production

doi:10.4121/21774530.v1
The doi above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future. For a link that will always point to the latest version, please use
doi: 10.4121/21774530
Datacite citation style:
Tom van der Beek (2022): Instances and file format for the Resource Constrained Project Scheduling Problem with Modular Production. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/21774530.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
Delft University of Technology logo
usage stats
588
views
240
downloads
categories
licence
cc-by-sa.png logo CC BY-SA 4.0

 This dataset contains instances and a description of the fileformat for the Resource Constrained Project Scheduling Problem with Modular Production 

history
  • 2022-12-23 first online, published, posted
publisher
4TU.ResearchData
format
.json
funding
  • New, Advanced and Value-Added Innovative Ships (grant code 769419) [more info...] European Commission
organizations
TU Delft, Faculty of Mechanical, Maritime and Materials Engineering (3mE), Department of Maritime and Transport Technology

DATA

files (2)