Instances and file format for the Resource Constrained Project Scheduling Problem with Modular Production

DOI:10.4121/21774530.v1
The DOI displayed above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future. For a link that will always point to the latest version, please use
DOI: 10.4121/21774530
Datacite citation style:
Tom van der Beek (2022): Instances and file format for the Resource Constrained Project Scheduling Problem with Modular Production. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/21774530.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite

Dataset

Delft University of Technology logo

Usage statistics

588
views
240
downloads

Categories

Licence

CC BY-SA 4.0

 This dataset contains instances and a description of the fileformat for the Resource Constrained Project Scheduling Problem with Modular Production 

History

  • 2022-12-23 first online, published, posted

Publisher

4TU.ResearchData

Format

.json

Funding

  • New, Advanced and Value-Added Innovative Ships (grant code 769419) [more info...] European Commission

Organizations

TU Delft, Faculty of Mechanical, Maritime and Materials Engineering (3mE), Department of Maritime and Transport Technology

DATA

Files (2)